Peachtree Corners issues building permits online through BS&A. Planning Commission meets Oct. 20 at 7 p.m. at City Hall. Permit questions: 470-395-7036.

Last checked Oct. 6, 2026. Facts on this page come from the City of Peachtree Corners’ Building & Permitting and Planning & Zoning pages.

The city’s Community Development Department handles building permits, inspections, zoning and land development inside Peachtree Corners. Gwinnett County still reviews fire and health plans and does fire inspections. Permits are filed online in the city’s BS&A system, which went live on Sept. 22, 2025.

Who to call

Getting a building permit

According to the city’s permitting process page:

  • Apply and upload plans in BS&A. Permits are accepted 9 a.m. to 4 p.m. Monday through Friday.
  • The process runs from application through plan review and inspections to a certificate of occupancy.
  • For a next-day inspection, ask before 3 p.m. Fire inspections are requested through Gwinnett County, using the county’s Citizen Access portal.
  • Construction is allowed 7 a.m. to 7 p.m. on weekdays.
  • Since Jan. 1, 2026, plans must cite the 2024 international codes and the 2023 National Electrical Code as amended by Georgia. The city rejects incomplete applications.

The city’s fee schedule lists permit fees.

Do I need a permit?

The city’s When Do I Need a Building Permit page has a full table. Some common answers:

Project Permit?
New deck, porch, screen porch or structural repair Yes
Shed or other accessory building over 200 square feet Yes
Shed 200 square feet or smaller No
Furnace or HVAC replacement, ductwork, water heater Yes
New electrical circuit, generator, solar panels Yes
Interior remodel with framing, drywall or lighting Yes
Painting, tile, carpet or trim No
Window or door swap with no structural change No
Residential re-roof No
Retaining wall taller than 48 inches Yes
Pool, spa or above-ground pool Yes
Driveway Yes (right-of-way application)

The city’s zoning FAQ says a residential fence does not need a permit, though the permit table lists fences over 7 feet; read the residential fence guidelines before you build. A banner does need a permit.

Land inside the Chattahoochee River Corridor has extra rules. Call the land development manager at 470-395-7022. Land disturbance permits go through the city’s Land Development office.

Zoning, rezoning and variances

Zoning is set by the city’s Zoning Ordinance. Look up any property on the zoning map.

  • Rezoning, special use permits and changes in conditions go to a Planning Commission public hearing, then two City Council readings. The city says the process takes about three months. Applications and status are on the current land use cases page.
  • Variances go to the Zoning Board of Appeals. Some standards can instead be varied by the Community Development Director through an administrative variance.
  • A zoning certification letter, often wanted by lenders, comes from the department.

The city warns of scam emails posing as staff and asking for wire transfers for zoning fees. It says it never uses wire transfers for these matters; call 678-691-1200 if in doubt.

Planning Commission and Zoning Board of Appeals

The Planning Commission is seven volunteers appointed by the City Council. It reviews rezonings and special use permits and recommends to the council. It meets at 7 p.m. on the third Tuesday of most months at City Hall, 310 Technology Parkway, with a live stream linked from the city calendar.

The Zoning Board of Appeals meets at 6:30 p.m. on the third Tuesday as needed and makes final decisions on variances. Appeals of its decisions go to Gwinnett County Superior Court.

The city’s 2026 public hearing calendar lists these remaining dates:

Planning Commission hearing City Council hearing
Tuesday, Oct. 20 Tuesday, Nov. 17
Tuesday, Nov. 10 Tuesday, Dec. 15
Tuesday, Dec. 8 Tuesday, Jan. 26, 2027

Two cases heard by the Planning Commission on Sept. 15 go to a council public hearing on Tuesday, Oct. 27: a change of conditions for a 7 Brew at 5025 Peachtree Parkway, and a rezoning of about 7.58 acres at 555 Guthridge Court from M-1 to R-TH for townhouses.

What this means for you

  • Swapping a water heater or HVAC unit needs a permit; painting and new carpet do not.
  • File in BS&A on a weekday, and ask for inspections before 3 p.m.
  • Want a say on a rezoning? Speak at the Planning Commission hearing, then the council’s second reading.

More: property taxes, who to call at City Hall and moving to Peachtree Corners.

Frequently asked questions

How do I apply for a building permit in Peachtree Corners?

Apply online through the city’s BS&A permitting portal, which replaced the old system on Sept. 22, 2025. Permits are accepted 9 a.m. to 4 p.m. Monday through Friday.

Do I need a permit for a fence in Peachtree Corners?

The city says a residential fence does not need a permit, but its permit table lists fences over 7 feet tall as needing one. Check the city’s residential fence guidelines first.

How do I find the zoning of my property in Peachtree Corners?

Use the city’s online zoning map. Questions go to the Planning and Zoning administrator at 678-691-1205.

When does the Peachtree Corners Planning Commission meet?

It usually meets at 7 p.m. on the third Tuesday of the month at City Hall, 310 Technology Parkway. The next public hearings on the 2026 calendar are Oct. 20, Nov. 10 and Dec. 8.

How long does a rezoning take in Peachtree Corners?

The city says the rezoning and special use permit process takes about three months, from a pre-application meeting through a Planning Commission hearing and two City Council readings.